Stage 2 of 10
The concrete slab is poured and the block walls go up. You can stand in the footprint of every room.
The slab is poured over the prepared pad. Then the exterior walls go up in concrete block, the start of a block and stucco house built to Florida hurricane-zone wind ratings.
This is the first stage where the house reads as a house from the street. The room sizes on your floor plan become real.
See where this stage fits in all ten stages on How We Build.
Stages follow the production schedule. Weather, inspections and material lead times can move them. For updates about your own home, contact your Gibraltar team. They can confirm current progress and answer questions about the next stage.
Tour a model or available home, review the features, and talk with our team about pricing and next steps.